Skip to main content

Small delay to launch of Mars rover due to ‘contamination concern’

The launch of NASA’s Perseverance rover has been pushed back by two days to July 22, due to an issue related to contamination of ground support equipment.

“NASA and United Launch Alliance are now targeting Wednesday, July 22, for launch of the Mars 2020 mission due to a processing delay encountered during encapsulation activities of the spacecraft,” NASA wrote in an update. “Additional time was needed to resolve a contamination concern in the ground support lines in NASA’s Payload Hazardous Servicing Facility (PHSF).”

Recommended Videos

NASA and other space agencies take extreme precautions to ensure that rovers and other exploratory vehicles do not carry any potential contaminants with them from Earth which could interfere with the environments on other planets like Mars. This includes assembling the rover in a clean room and having technicians working on the project wearing “bunny suits” which prevent the rover from being contaminated with unwanted particles.

Mars 2020 Perseverance rover is being prepared for encapsulation
Inside the Payload Hazardous Servicing Facility at NASA’s Kennedy Space Center in Florida, the agency’s Mars 2020 Perseverance rover is being prepared for encapsulation in the United Launch Alliance Atlas V payload fairing on June 18, 2020. NASA/Christian Mangano

However, there’s no need to be concerned about the condition of either the rover or the Atlas V rocket which will be used to launch it. NASA confirmed that both the rover and the rocket were in good condition and that there should be no issue with the launch going ahead during the planned window, which runs from July 22 until August 11 this year.

“The spacecraft and vehicle remain healthy,” NASA said in the statement. “The launch of the Mars 2020 mission on an Atlas V rocket from Space Launch Complex-41 on Cape Canaveral Air Force Station is scheduled for 9:35 a.m. ET with a two-hour window.”

The Perseverance rover is on a mission to search for signs of ancient life in Mars’ Jezero Crater. As the rover enters its final month of preparations before the launch date, the team is performing final checks so everything is ready for the big launch day.

NASA previously announced another short delay to the launch date, from July 17 to July 20, due to the need for additional time to carry out repairs on ground support equipment.

Georgina Torbet
Georgina has been the space writer at Digital Trends space writer for six years, covering human space exploration, planetary…
How to watch SpaceX’s Crew-9 launch to the ISS on Saturday
Crew-7's Falcon 9 rocket and Dragon spacecraft on the launchpad.

[UPDATE: SpaceX has called off Thursday's launch attempt due to an approaching storm. It's now targeting 1:17 p.m. ET on Saturday, September 28.]

SpaceX and NASA are gearing up for the Crew-9 launch that will carry an American astronaut and a Russian cosmonaut to the International Space Station (ISS) aboard a SpaceX Crew Dragon spacecraft.

Read more
Elon Musk shares new target date for Starship voyage to Mars
elon musk stylized image

SpaceX is aiming to launch “about five” uncrewed Starship voyages to Mars in two years’ time, according to a post on X (formerly Twitter) by CEO Elon Musk on Sunday.

Musk said that if the uncrewed missions land safely on the red planet, then the first crewed mission could take place as early as 2028, but he added that “if we encounter challenges, then the crewed missions will be postponed another two years” due to the alignment of Earth and Mars that makes such journeys possible. He continued: “We want to enable anyone who wants to be a space traveler to go to Mars! That means you or your family or friends -- anyone who dreams of great adventure. Eventually, there will be thousands of Starships going to Mars and it will a glorious sight to see! Can you imagine? Wow.”

Read more
Why the SpaceX Crew-9 launch has been delayed again
NASA’s SpaceX Crew-9 Commander Nick Hague smiles and gives two thumbs up during the crew equipment interface test at SpaceX’s Dragon refurbishing facility at Kennedy Space Center in Florida.

The SpaceX Crew-9 mission, which will see just two astronauts head to the International Space Station (ISS) with two empty seats on their Crew Dragon spacecraft, has been delayed once again. This time, however, the delay is only one day, with the new launch date set for September 26.

The mission had originally been slated to launch on August 18 with four crew members, but this was pushed back to allow time for the troubled Boeing Starliner capsule to return, uncrewed, from the station. NASA decided that its astronauts Butch Wilmore and Suni Williams, who traveled to the station on the Starliner, would stay on the station and become a part of Crew-9 -- so the two empty seats on the Dragon are reserved for them to travel home in in February next year.

Read more