Skip to main content

NASA’s CAPSTONE arrival brings lunar space station a step closer

Despite some tense moments on its way to the moon, NASA has confirmed that the CAPSTONE CubeSat has successfully completed its first orbit insertion maneuver.

The achievement puts NASA another step closer to the launch of its Gateway lunar space station that will serve as a base for crewed missions, as well as a steppingstone for astronaut moon landings.

Recommended Videos

“Big news!” NASA boss Bill Nelson tweeted on Sunday. “NASA’s CAPSTONE arrived to its orbit at the moon and completed its first orbit insertion maneuver! The spacecraft will continue to refine its orbit over the next few days, and will test the orbit planned for the NASA Gateway lunar outpost.”

Please enable Javascript to view this content

Big news! @NASA's #CAPSTONE arrived to its orbit at the Moon and completed its first orbit insertion maneuver!

The spacecraft will continue to refine its orbit over the next few days, and will test the orbit planned for the @NASA_Gateway lunar outpost. https://t.co/oy7Rhl2oPf

— Bill Nelson (@SenBillNelson) November 14, 2022

CAPSTONE — short for Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment — will be the first satellite to test the proposed orbit for the Gateway, a facility that will play a key role in the space agency’s Artemis program.

The CAPSTONE mission operations team confirmed that the satellite fired its thrusters to put it into orbit on Sunday at 7:39 p.m. ET. The satellite is now in what is known as a near-rectilinear halo orbit (NRHO), the same that will be used by the Gateway outpost.

NASA said that over the next five days, CAPSTONE will perform two additional cleanup maneuvers to refine its orbit, after which the team will analyze the data for confirmation that CAPSTONE remains on track in the NRHO. The work will help NASA plan the deployment of Gateway in the next few years.

Artist's illustration of CAPSTONE approaching the moon.
Artist’s illustration of CAPSTONE approaching the moon. Illustration by NASA/Daniel Rutter

The positive news comes in the same week that NASA is aiming to conduct the maiden launch of its next-generation Space Launch System (SLS) rocket for a voyage to the moon as part of the Artemis I mission.

The SLS rocket will power an uncrewed Orion spacecraft toward our nearest celestial neighbor, where it’ll perform a flyby before returning to Earth. If the test mission proves successful, Artemis II will take the same route, but with a crew on board. After that, Artemis III will endeavor to put the first woman and first person of color on the lunar surface, with both astronauts using the Gateway station as a stop-off point during a historic mission that could take place as early as 2025.

Looking further ahead, NASA plans to build a base on the surface of the moon where astronauts can live and work for extended periods, with the Gateway operating as a vital link between the base and Earth.

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
With Intuitive Machines’ mission cut short, when is the next lunar landing?
NASA's Orion spacecraft as it flies by the moon.

Performing a controlled, soft landing on the moon isn’t easy. Three missions attempted to reach our nearest neighbor in recent weeks. Two of the landers -- one from Japan’s space agency and another from Texas-based Intuitive Machines -- touched down on the lunar surface but toppled over, creating challenges for their respective mission operators. A third moon-bound mission, from Pittsburgh-based Astrobotic, suffered a propellant leak shortly after launch that prevented it from even attempting a landing.

The most recent visit, by Intuitive Machines, made history on February 22 when it became the first commercial company to achieve a soft lunar touchdown in a mission that was also the first U.S. lunar landing in more than 50 years.

Read more
The moon is shrinking, causing moonquakes at the lunar south pole
Lunar Reconnaissance Orbiter Camera (LROC), Narrow Angle Camera (NAC) mosaic of the Wiechert cluster of lobate scarps (left pointing arrows) near the lunar south pole. A thrust fault scarp cut across an approximately 1-kilometer (0.6-mile) diameter degraded crater (right pointing arrow).

The moon was long thought to be geologically dead, with no processes occurring inside its core.  But increasing evidence over the last decades suggests that the moon isn't static and could, in fact, still be tectonically active. Now, new research from NASA suggests that the shrinking of the moon over time is causing moonquakes and the formation of faults near its south pole.

The research is part of NASA's interest in the lunar south pole, given the agency's intention to send astronauts there. Researchers have modeled lunar activity to look for the source of moonquakes seen during the Apollo missions.

Read more
NASA confirms burn-up date for failed Peregrine spacecraft
Astrobotic's Peregrine lander.

Astrobotic’s Peregrine spacecraft will burn up in Earth’s atmosphere on Thursday, January 18, NASA has confirmed.

Pittsburgh-based Astrobotic said earlier in the week that the burn-up of the Peregrine spacecraft, which is about the size of a storage shed, posed no safety risks and will remove from orbit what would otherwise become a piece of hazardous space junk.

Read more