Skip to main content

Artemis II lunar crew rehearses splashdown in the Pacific

NASA’s Artemis II crew received disappointing news in January when their lunar-flyby mission was pushed back at least 10 months to September 2025.

Recommended Videos

The space agency said the delay was necessary to give Artemis teams “more time to work through the challenges with first-time developments and integration.” While the extra time gives the space agency more time to prepare the necessary hardware, it also gives the Artemis II crew — comprising Christina Koch, Victor Glover, Reid Wiseman, and Jeremy Hansen — additional time to train for their highly anticipated moon mission.

Please enable Javascript to view this content

The training included a recent trip to the Pacific Ocean, where the four crewmembers rehearsed what would be the final stage of their 10-day mission: the splashdown.

The rehearsal involved a mockup of the Orion spacecraft to add as much realism to the exercise as possible. However, the boats, ships, and helicopters used in the rehearsal were the real deal.

When the astronauts return from their epic voyage next year and land in the ocean, a joint NASA and Department of Defense team led by NASA’s Exploration Ground Systems Program will be waiting off the coast of California to pluck them from the Orion spacecraft before transporting them to a nearby naval ship.

Just before that, after Orion hits the water, a team of Navy divers in small boats will first assess the environment around the capsule to make sure there are no hazards present. Once cleared for approach, teams will stabilize Orion by installing an inflatable collar to the spacecraft. To safely retrieve the astronauts, the divers also will install an inflatable raft beneath Orion’s side hatch to assist in the safe removal of the astronauts.

Once the crew has exited the capsule, the raft will be moved about 100 yards from Orion so the astronauts can be lifted into a helicopter and transferred to the nearby naval ship. There, the astronauts will be taken to a medical bay for a post-mission evaluation before flying on a helicopter back to shore and then onward to the Johnson Space Center in Houston, Texas.

“Our highly choreographed recovery operations will help ensure the final phase of NASA’s first crewed mission to the moon in more than 50 years ends as a success,” Lili Villareal, NASA’s landing and recovery director, said on NASA’s website.

The Artemis II crew will be powered to orbit by NASA’s new Space Launch System rocket in a launch from the Kennedy Space Center in Florida. The flight will involve coming within about 80 miles of the lunar surface before circling the moon and returning to Earth. A successful mission will pave the way for a crewed moon landing that’s currently set for 2028.

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
Odysseus lunar lander sends a ‘fitting farewell transmission’ to Earth
An image captured by Intuitive Machines' Odysseus lunar lander.

Despite a messy landing that left the Odysseus spacecraft with a broken leg and tilting over, the team at Intuitive Machines has hailed its IM-1 lunar mission a success.

That’s because it managed to get Odysseus onto the lunar surface largely in one piece and operating well enough to send data back to Earth.

Read more
With Intuitive Machines’ mission cut short, when is the next lunar landing?
NASA's Orion spacecraft as it flies by the moon.

Performing a controlled, soft landing on the moon isn’t easy. Three missions attempted to reach our nearest neighbor in recent weeks. Two of the landers -- one from Japan’s space agency and another from Texas-based Intuitive Machines -- touched down on the lunar surface but toppled over, creating challenges for their respective mission operators. A third moon-bound mission, from Pittsburgh-based Astrobotic, suffered a propellant leak shortly after launch that prevented it from even attempting a landing.

The most recent visit, by Intuitive Machines, made history on February 22 when it became the first commercial company to achieve a soft lunar touchdown in a mission that was also the first U.S. lunar landing in more than 50 years.

Read more
NASA delays first crewed Artemis missions to the moon
An illustration showing astronauts on the moon.

NASA has delayed its plan to send four astronauts on a flyby of the moon in the Artemis II mission in November, announcing that it will now take place no earlier than September 2025.

In the same announcement made on Tuesday, NASA chief Bill Nelson said that the first crewed landing, originally planned for 2025 as part of Artemis III, will now launch in September 2026 at the earliest.

Read more