Skip to main content
  1. Home
  2. Mobile

Mobile

Mobile and smartphone news, reviews, and discussion for everything from Android to iPhone and every accessory and app you could ever use.

Explore More

Someone holding an iPhone 16, showing a home screen.

Apple’s futuristic iPhone display may not be released for a while longer

Apple's bezel-less iPhone display is speculated to miss its initial launch timeline due to technical difficulties that inhibit mass production.
The rear panel and camera island on the Nothing Phone 2a.

There’s a glaring issue with Nothing Phones, and it isn’t pretty

The OnePlus logo on the back of the OnePlus 12R.

The 2025 Android phone I’m most looking forward to isn’t from Samsung or Google

An iPhone 16 Pro showing RCS messaging.

I finally have RCS on my iPhone, and it’s one of my favorite iOS 18 features

The Ray-Ban Meta smartglasses, Apple Watch Series 10, and Oura Ring 4 on a table.

These 3 gadgets prove wearable tech reached its peak in 2024

Someone holding a phone showing the Android 16 logo on its screen.

How to use Android 16’s new Notification Cooldown setting

The Apple Watch Series 10.

5 things I want to see from the Apple Watch in 2025

The Amazon Kindle Paperwhite 2024 on a table with a pair of glasses.

Amazon Kindle Paperwhite 2024 review: This is the Kindle you should buy

A person holding the Apple iPhone 16 Pro Max.

Here’s every carrier that lets your iPhone send RCS messages to Android phones

App Store screenshot on iPhone.

Is your child safe from inappropriate apps on Apple App Store? A report says no

The back of the yellow Samsung Galaxy S24 Ultra.

It sure looks like the Samsung Galaxy S25 is getting a price increase

MediaTek Dimensity 8400 SoC visualized on a phone.

MediaTek’s Dimensity 8400 is going to make 2025 phones faster and more efficient

Original Series
Someone holding the iPad (2022) with the display turned on.

An Apple insider says a new iPad is coming in spring 2025. Here’s what we know

Apple didn't release a new base model iPad in 2024. According to a new report, that might change in spring 2025.
The Mocha Mousse Motorola Razr Plus in someone's pocket.

I have the new Mocha Mousse color for the Motorola Razr Plus, and it’s stunning

Motorola recently freshened up the Razr Plus 2024 with a new Mocha Mousse color. I have it, and I'm in love.
Three Galaxy S24 Plus models laying on a table, including the white, gray, and yellow ones.

Samsung has a smartphone design problem

Hey, Samsung, your Galaxy S flagship looks like the Galaxy A midranger, which is a copy of the entry-level Galaxy A series. And the Galaxy M series. See the pattern?
An iPhone 15 Pro Max running iOS 18, showing its home screen.

If your iPhone can handle iOS 18.2, it can probably handle iOS 19

If you're using iOS 18, then you'll be able to install iOS 19, according to a new leak — although some features might be restricted on older devices.
The iPhone 16 sitting on top of orange mums.

The next iOS 18 update is on its way. Here’s what we know

Your iPhone might have another update just around the corner that could help straighten out any bugs introduced by iOS 18.2.
Front page of a book on Onyx BOOX Go 10.3 tablet.

How to transfer your books from Goodreads to StoryGraph

Goodreads isn't the best book-tracking app, but it was the only one. Until now. Here's how to move all your books from Goodreads to StoryGraph.
The Oura Ring app on an iPhone 16 Pro Max, showing the Sleep screen.

I tracked my sleep with a smart display, ring, and watch. This is my favorite

If you are serious about tracking your sleep, should you use a smart ring, a smartwatch, or even a smart display on your nightstand? Let's find out.
OnePlus 13 in Midnight Ocean beside iPhone 16 Pro in Natural Titanium.

OnePlus 13 vs. iPhone 16 Pro: Can the flagship killer take another head?

The OnePlus 13 arrives to pit the Qualcomm's Snapdragon 8 Elite against Apple's flagship iPhone 16 Pro. How does it fare? We found out.
step of Gemini processing a PDF in Files by Google app.

Gemini brings a fantastic PDF superpower to Files by Google app

While reading a PDF document in the Files by Google app, users can now seamlessly pull Gemini and ask it to make sense of the contents with a single tap.
Google Chrome on an Android phone.

Google proposes big changes for the future of Search and Android apps

Google says it will offer less restrictive Search licensing terms and won't pressure Android partners into exclusive or conditional preloading clauses.
Third part watch face on OnePlus Watch 2r.

Upcoming OnePlus Watch 3 might have a rotating crown

The OnePlus Watch 3 is expected to have a rotating crown as well as several significant (and much-requested) hardware upgrades.
Promotional image for OuttaFocus. Photo of a collection of smartphone cameras.

This is the worst smartphone camera I used in 2024, and it’s not even close

Choosing the best camera phone of 2024 was easy, but what about the worst camera phone of the year? There are some strong contenders, but only one winner.
Using Visual Intelligence on an iPhone 16 Pro showing ChatGPT answer.

How to use Visual Intelligence on your iPhone with iOS 18.2

If you have an iPhone 16 device, then you should now be able to use Visual Intelligence. Here's how it works.
Santa Claus delivering presents.

Best apps for tracking Santa on your phone

Are your kids anxious for Santa's arrival? Then check out these great apps that track Jolly Old St. Nick's progress on Christmas Eve.
New Albums section in file details in Google Photos.

It just got a lot easier to see what pictures are in your Google Photos albums

Google Photos is one of the best photo apps, and it's always getting better. The latest improvement makes it easier to see what's in your albums.
Someone holding the Samsung Galaxy S24 with the display turned on.

The base model Galaxy S25 will get a RAM upgrade we’ve waited years for

The Samsung Galaxy S25 will come with a minimum of 12GB of RAM in its base model, according to a new leak.
Google Photos' year in review feature for 2024.

Google Photos is getting a cool new feature to speed up your photo edits

Google Photos for Android is picking up another one-click editing tool. "Quick Edit" should be arriving soon on supported devices.
Side profile of the Samsung Galaxy S24 FE.

A new leak teases how thin the Galaxy S25 Slim will be — and it’s impressive

The Samsung Galaxy S25 Slim isn't due to release until sometime next year, but this latest tip puts it at less than 7mm thick.
An iPhone 6S in gold held against a red pipe.

Have an old iPhone or iPad? You can no longer use this iCloud feature

The minimum requirements to use iCloud backups has changed, which affects older iPhones and iPads.
Safety check on iPhone

Tips to keep your smartphone just as safe as a government official’s

A top U. S. government cybersecurity agency has released a set of smartphone safety protocols for top officials and politicians. You should follow them, too.
The side of the Oura Ring 4.

I wore an Oura Ring for all of 2024. Here’s why I love it and why I’m concerned

I've worn an Oura Ring all year, and this is how it holds my attention but also why I'm a little concerned about how it'll look through 2025.
Smartphones released in 2024.

MKBHD just revealed his smartphone of the year

Popular tech YouTuber MKBHD said his winning selection for phone of the year might be the most boring choice, but he absolutely loves it.

Mobile News

Android

Wearables

Phone Apps

Joe Maring has been the Section Editor of Digital Trends’ Mobile team since June 2022. He leads a team of 13 writers and editors with the single goal of publishing the best mobile tech content on the Internet. While much of his time is spent planning and editing the work of his section’s amazing contributors, Joe equally loves writing himself — whether he’s digging into wonky AI apps on phones or explaining why you should buy the latest iPhone.

Joe started talking and writing about phones in 2012 with his tech-focused YouTube channel and website, MobileCupOfJoe. He’s contributed to PhoneArena, XDA Developers, and 9to5Google. He held the titles of News Editor and Senior Editor at Android Central between 2017 and 2021. Before joining Digital Trends, Joe was a Senior Writer and Editor for Screen Rant’s tech section.

Throughout his years in this industry, Joe has attended major trade shows such as CES, MWC, and IFA. He’s also appeared on major tech podcasts, including Tech News Weekly, Clockwise, and the Android Police Podcast.

Joe lives in Michigan with his two cats (Minnie and Polo), a very sweet and dumb pit bull/boxer mix (Damon), and Kenn — his partner of 10 years. When he’s not working, you’ll likely find Joe walking a nature trail, reading at his favorite coffee shop, or watching the Lions.

Find Joe on Bluesky.