Skip to main content

See the giant crawler that will carry NASA’s mega moon rocket to the pad

NASA is continuing preparations for the testing and eventual launch of its “mega moon rocket,” or Space Launch System. This rocket is designed to eventually carry astronauts back to the moon under the Artemis program, but first, it will be put through its paces in the uncrewed Artemis I mission.

This week, NASA announced that it was getting ready for the rollout of the rocket, in which the rocket is transported four miles from the Vehicle Assembly Building to the launch pad at NASA’s Kennedy Space Center in Florida. And if you’re wondering how exactly you transport a huge rocket that stands at 332 feet (98.1 meters) tall, then NASA has the answer for you: By using a massive crawling vehicle called the Crawler Transporter-2.

The  Crawler Transporter-2 at the doors of the Vehicle Assembly Building (VAB).
Engineers and technicians at NASA’s Kennedy Space Center in Florida drove Crawler Transporter-2 on March 11, 2022, to the doors of the Vehicle Assembly Building (VAB). Soon, it will go inside the VAB where it will carry the Artemis I Moon rocket to launch pad 39B. NASA/Chad Siwik

“Earlier today, engineers and technicians at NASA’s Kennedy Space Center in Florida drove Crawler Transporter-2, which will carry NASA’s Moon rocket to the launch pad, to the doors of the Vehicle Assembly Building (VAB),” NASA wrote on Friday, March 11. “Soon, the 6.6-million-pound crawler will go inside the VAB and slide under the Space Launch System rocket and Orion spacecraft placed on the Mobile Launcher. Technicians will finish up preparations to transport the rocket traveling at a top speed of 1 mph to Launch Complex 39B for a wet dress rehearsal test ahead of the Artemis I launch.”

Recommended Videos

To get the rocket ready for transport, NASA is retracting the 20 platforms which surround it and its Orion spacecraft. That way, it will be ready for the rollout which is scheduled for Thursday, March 17. The rocket will be taken to the launch pad and put through what is called a wet dress rehearsal. This is where everything is prepared as it would be for a real launch, and the rocket is filled with fuel. Then there will be a launch countdown, but the rocket engines won’t actually fire.

Please enable Javascript to view this content

This is one of the final tests of the rocket to ensure it is ready for its Artemis I mission, which could go ahead as early as May this year.

Georgina Torbet
Georgina has been the space writer at Digital Trends space writer for six years, covering human space exploration, planetary…
See the polar moon sites where NASA plans to land its astronauts
An artist’s concept of an Artemis astronaut deploying an instrument on the lunar surface.

NASA has updated its list of potential landing sites for the next human visit to the moon, which is planned for 2026. The Artemis III mission will see the first crewed lunar landing since the Apollo era, and the plan is for astronauts to explore the moon's South Pole region where there is thought to be water ice on the lunar surface.

NASA shared a list of 13 candidate landing locations for Artemis III in 2022, but has now updated its list to nine candidates. Some of these were on the list previously, while others have been added such as the Mons Mouton mountain and plateau, which is particularly interesting to scientists because the height of the mountain means that there are permanently shadowed regions nearby. These places, where sunlight never touches, are particularly good candidates when it comes to looking for water ice.

Read more
NASA scrubs Thursday’s launch of Europa Clipper mission to Jupiter moon
The Falcon Heavy rocket on the launchpad at the Kennedy Space Center in Florida.

SpaceX and NASA have called off Thursday’s planned launch of the Europa Clipper mission due to Hurricane Milton, which is heading east toward Florida, home of the Kennedy Space Center.

“Once the storm passes, recovery teams will assess the safety of the spaceport and the launch processing facilities for damage before personnel return to work,” NASA said in a post on social media on Sunday, adding in another message: “Teams have secured the spacecraft in SpaceX’s hangar at NASA Kennedy.”

Read more
A NASA Mars rover has a giant hole in one of its wheels
A damaged wheel on NASA's Mars Curiosity rover.

 

If the tire on your car fails, it’s either a case of changing it yourself or getting someone to do it for you. For rovers on Mars, neither option is available.

Read more