Skip to main content

Watch NASA’s animation of upcoming Artemis 1 moon mission

NASA is aiming to put the first woman and the next man on the moon in 2024, and while the target date is looking increasingly tight, the space agency is nevertheless keen to generate some early buzz around the upcoming endeavor.

The lunar landing will be the third mission in NASA’s Artemis program, which has long-term goals of establishing a permanent base on the moon and performing crewed missions to Mars.

Recommended Videos

The uncrewed Artemis 1 mission, currently set for March 2022, will perform a flyby of the moon before returning to Earth. Artemis 2 will send a crew on a flyby of the moon, while Artemis 3 will involve the highly anticipated lunar landing.

Please enable Javascript to view this content

NASA this week posted a video showing how it expects the early stages of the Artemis 1 mission to play out when its almighty Space Launch System (SLS) rocket blasts off from the Kennedy Space Center next year. It’s a wonderfully detailed animation that shows many of the vital stages of the mission, and you can watch it below.

What will it look like when NASA's Space Launch System rocket launches from @NASAKennedy to the Moon for NASA's #Artemis I mission?

Hear the countdown and get a preview HERE >> https://t.co/q1Rvcv2r1g pic.twitter.com/7TnQbh8pD7

— NASA_SLS (@NASA_SLS) May 17, 2021

The SLS rocket is part of a setup that includes the Orion spacecraft, the Lunar Gateway space station, and the human landing system that will support NASA’s future space exploration initiatives.

The SLS has a height of 98.1 meters (322 feet), and at launch the core booster, together with its two outboard boosters, will produce 8.8 million pounds of thrust, “equivalent to more than 160,000 Corvette engines,” NASA says. That makes it 13% more powerful than the space shuttle and 15% more powerful than the Saturn 5 rocket, the launch vehicle used for astronaut missions to the moon 50 or so years ago.

The Orion spacecraft, which will be able to carry six astronauts on a mission lasting up to 21 days, has recently been put through a range of demanding tests, including one that involved drops into a giant tank of water to ensure it can handle splashdowns in the ocean upon return to Earth. The SLS core stage booster, meanwhile, recently experienced a lengthy barge trip from NASA’s Stennis Space Center near Bay St. Louis, Mississippi, where it underwent testing, to the Kennedy Space Center for Artemis 1 launch preparations.

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
NASA scrubs Thursday’s launch of Europa Clipper mission to Jupiter moon
The Falcon Heavy rocket on the launchpad at the Kennedy Space Center in Florida.

SpaceX and NASA have called off Thursday’s planned launch of the Europa Clipper mission due to Hurricane Milton, which is heading east toward Florida, home of the Kennedy Space Center.

“Once the storm passes, recovery teams will assess the safety of the spaceport and the launch processing facilities for damage before personnel return to work,” NASA said in a post on social media on Sunday, adding in another message: “Teams have secured the spacecraft in SpaceX’s hangar at NASA Kennedy.”

Read more
How to watch NASA’s oldest active astronaut launch to the ISS on Wednesday
NASA astronaut Don Pettit.

NASA Astronaut Don Pettit Soyuz MS-26 Launch

Don Pettit isn't your average senior citizen. Instead of enjoying life in the slow lane, he's getting ready for a rocket ride to the International Space Station (ISS) on Wednesday.

Read more
Intuitive Machines to carry NASA experiments to the moon in 2027
An artist’s concept of Intuitive Machines’ Nova-C lunar lander on the Moon’s South Pole.

Intuitive Machines, the company that earlier this year managed the first lunar landing by a commercial entity (partly successfully) will be returning to the moon with more NASA payloads. As part of NASA's CLPS (Commercial Lunar Payload Services) program, Intuitive Machines will design and build a lander to launch to the moon's south pole, and NASA will pay $117 million for it to carry six science payloads.

This is part of NASA's broader effort to embrace the burgeoning private space industry by becoming a customer of space companies rather than designing and building its own spacecraft. The aim is for Intuitive Machines to arrive at the moon's south pole in 2027, ahead of the Artemis missions that will see humans return to the lunar surface. The company will also be launching another lunar lander called Athena later this year, with a third launch planned next year as well.

Read more