Skip to main content

NASA scrubbed its moon rocket launch on Monday. Now what?

An issue with one of the four main engines forced NASA to call off the launch of its mega moon rocket just 40 minutes before it was due to lift off on Monday morning.

As of Monday night, the new Space Launch System (SLS) rocket and Orion spacecraft remain on Pad 39B at the Kennedy Space Center in Florida while the Artemis I mission team consider what to do next.

Recommended Videos

The next opportunity to launch the Artemis I mission to the moon is on Friday, September 2, but this can only happen if NASA engineers can quickly fix the issue that it spotted on the number three engine of the rocket’s core stage earlier on Monday.

Failing that, the next window opens on Monday, September 5.

NASA has announced it will hold a media teleconference at 6 p.m. ET on Tuesday, August 30 to discuss the matter. It’s hoped that during the teleconference the mission team will be in a position to confirm the time and date of the next launch attempt.

The highly anticipated Artemis I mission will be an uncrewed flight aimed at testing NASA’s new SLS rocket and Orion spacecraft. The spacecraft will be sent on a voyage around the moon before returning to Earth six weeks after launch.

“Through Artemis missions, NASA will land the first woman and the first person of color on the moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars,” NASA said.

With so much at stake with Artemis I, it’s no surprise that NASA called off Monday’s launch after spotting the engine issue. Not wanting to rush decisions in a bid to send the rocket on its way before the launch window closed at 10:33 a.m. ET, the team decided to stand down and get some rest, enabling it to tackle the situation with fresh minds on Tuesday morning.

Speaking to the BBC after NASA called off Monday’s launch, Dr Wendy Whitman Cobb, professor of strategy and security studies at the School of Advanced Air and Space Studies in Montgomery, Alabama, described the situation as “not much of a setback at all,” adding that Space Shuttle launches, for example, rarely went ahead at their first scheduled time.

“Since this was a test, these types of issues coming up were expected,” Whitman-Cobb said, adding, “I think I would’ve been more surprised if it’d actually gone up on time today.”

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
NASA can now talk to its spacecraft using lasers
NASA’s Psyche spacecraft is depicted receiving a laser signal from the Deep Space Optical Communications uplink ground station at JPL’s Table Mountain Facility in this artist’s concept. The DSOC experiment consists of an uplink and downlink station, plus a flight laser transceiver flying with Psyche.

NASA has a communications problem: The radio frequencies used by spacecraft for communications are getting too busy. As more missions are sent into outer space, and as these missions carry increasingly sophisticated instruments, the amount of data that needs to be sent back to Earth is growing beyond the capacity of current radio communications systems.

The solution to this problem is to use higher frequencies, which can carry more data. But before any new communication system can be put into widespread use, it has to be tested.

Read more
How to watch NASA’s oldest active astronaut launch to the ISS on Wednesday
NASA astronaut Don Pettit.

NASA Astronaut Don Pettit Soyuz MS-26 Launch

Don Pettit isn't your average senior citizen. Instead of enjoying life in the slow lane, he's getting ready for a rocket ride to the International Space Station (ISS) on Wednesday.

Read more
Intuitive Machines to carry NASA experiments to the moon in 2027
An artist’s concept of Intuitive Machines’ Nova-C lunar lander on the Moon’s South Pole.

Intuitive Machines, the company that earlier this year managed the first lunar landing by a commercial entity (partly successfully) will be returning to the moon with more NASA payloads. As part of NASA's CLPS (Commercial Lunar Payload Services) program, Intuitive Machines will design and build a lander to launch to the moon's south pole, and NASA will pay $117 million for it to carry six science payloads.

This is part of NASA's broader effort to embrace the burgeoning private space industry by becoming a customer of space companies rather than designing and building its own spacecraft. The aim is for Intuitive Machines to arrive at the moon's south pole in 2027, ahead of the Artemis missions that will see humans return to the lunar surface. The company will also be launching another lunar lander called Athena later this year, with a third launch planned next year as well.

Read more