Skip to main content

NASA’s mega moon rocket arrives at launchpad (again)

NASA’s next-generation SLS rocket and Orion spacecraft have arrived on the launchpad at the Kennedy Space Center ahead of a second attempt at a key preflight test.

NASA’s Space Launch System (SLS) rocket and Orion spacecraft arrived at Kennedy’s launch complex 39B following a four-mile, eight-hour journey from the facility’s Vehicle Assembly Building.

Recommended Videos

Carried by one of NASA’s low-slung crawler vehicles that moves at no faster than 1 mph, the SLS and Orion vehicles reached the launchpad at about 8:20 a.m. ET on Monday, June 6.

Please enable Javascript to view this content

The space agency shared several images of the 332-feet (98.1-meter) rocket in position:

📸 Rollout photos!

In the early hours of the morning, @NASAGroundSys transported the SLS rocket and @NASA_Orion spacecraft to launch pad 39B for the next wet dress rehearsal test ahead of #Artemis I. Catch a live view of the rocket at the pad HERE >> https://t.co/c4PCzejcLt pic.twitter.com/CE7WIQtsZc

— NASA_SLS (@NASA_SLS) June 6, 2022

In preparation for the Artemis I lunar mission, the SLS rocket will undergo a so-called “wet dress rehearsal” no earlier than June 19. This important pre-launch procedure involves filling the rocket’s tanks with fuel and performing a mock countdown.

Prior to the rehearsal, NASA engineers will spend some time securing the SLS rocket and mobile launcher to ground support equipment.

This is the second time for the SLS rocket and Orion spacecraft to be transported to the launchpad for a wet dress rehearsal. But after reaching the launchpad in March, a rehearsal in early April was called off after engineers identified a number of technical issues.

As a result, the vehicle was rolled back to the Vehicle Assembly Building so the issues could be addressed.

Once the SLS rocket achieves a successful wet dress rehearsal, the vehicle will be deemed ready for its first mission, Artemis I.

The uncrewed test mission will use the SLS to power the Orion toward the moon. The spacecraft will perform a flyby of our nearest neighbor before returning to Earth.

A successful flight will pave the way for Artemis II, which will take the same path but this time with astronauts aboard the Orion.

If NASA is fully satisfied with the performance of both the SLS and the Orion, Artemis III will land the first woman and first person of color on the lunar surface in what will be the first crewed lunar landings since the final Apollo mission in 1972. Artemis III is currently scheduled for no earlier than 2025.

The Artemis program is seeking to launch a new era in lunar exploration with a view to establishing the first long-term presence on the moon. NASA said that it aims to “use what we learn on and around the moon to take the next giant leap: Sending the first astronauts to Mars.”

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
NASA scrubs Thursday’s launch of Europa Clipper mission to Jupiter moon
The Falcon Heavy rocket on the launchpad at the Kennedy Space Center in Florida.

SpaceX and NASA have called off Thursday’s planned launch of the Europa Clipper mission due to Hurricane Milton, which is heading east toward Florida, home of the Kennedy Space Center.

“Once the storm passes, recovery teams will assess the safety of the spaceport and the launch processing facilities for damage before personnel return to work,” NASA said in a post on social media on Sunday, adding in another message: “Teams have secured the spacecraft in SpaceX’s hangar at NASA Kennedy.”

Read more
How to watch NASA’s oldest active astronaut launch to the ISS on Wednesday
NASA astronaut Don Pettit.

NASA Astronaut Don Pettit Soyuz MS-26 Launch

Don Pettit isn't your average senior citizen. Instead of enjoying life in the slow lane, he's getting ready for a rocket ride to the International Space Station (ISS) on Wednesday.

Read more
Intuitive Machines to carry NASA experiments to the moon in 2027
An artist’s concept of Intuitive Machines’ Nova-C lunar lander on the Moon’s South Pole.

Intuitive Machines, the company that earlier this year managed the first lunar landing by a commercial entity (partly successfully) will be returning to the moon with more NASA payloads. As part of NASA's CLPS (Commercial Lunar Payload Services) program, Intuitive Machines will design and build a lander to launch to the moon's south pole, and NASA will pay $117 million for it to carry six science payloads.

This is part of NASA's broader effort to embrace the burgeoning private space industry by becoming a customer of space companies rather than designing and building its own spacecraft. The aim is for Intuitive Machines to arrive at the moon's south pole in 2027, ahead of the Artemis missions that will see humans return to the lunar surface. The company will also be launching another lunar lander called Athena later this year, with a third launch planned next year as well.

Read more