Skip to main content

NASA’s mega moon rocket arrives at launchpad (again)

NASA’s next-generation SLS rocket and Orion spacecraft have arrived on the launchpad at the Kennedy Space Center ahead of a second attempt at a key preflight test.

NASA’s Space Launch System (SLS) rocket and Orion spacecraft arrived at Kennedy’s launch complex 39B following a four-mile, eight-hour journey from the facility’s Vehicle Assembly Building.

Recommended Videos

Carried by one of NASA’s low-slung crawler vehicles that moves at no faster than 1 mph, the SLS and Orion vehicles reached the launchpad at about 8:20 a.m. ET on Monday, June 6.

The space agency shared several images of the 332-feet (98.1-meter) rocket in position:

📸 Rollout photos!

In the early hours of the morning, @NASAGroundSys transported the SLS rocket and @NASA_Orion spacecraft to launch pad 39B for the next wet dress rehearsal test ahead of #Artemis I. Catch a live view of the rocket at the pad HERE >> https://t.co/c4PCzejcLt pic.twitter.com/CE7WIQtsZc

— NASA_SLS (@NASA_SLS) June 6, 2022

In preparation for the Artemis I lunar mission, the SLS rocket will undergo a so-called “wet dress rehearsal” no earlier than June 19. This important pre-launch procedure involves filling the rocket’s tanks with fuel and performing a mock countdown.

Prior to the rehearsal, NASA engineers will spend some time securing the SLS rocket and mobile launcher to ground support equipment.

This is the second time for the SLS rocket and Orion spacecraft to be transported to the launchpad for a wet dress rehearsal. But after reaching the launchpad in March, a rehearsal in early April was called off after engineers identified a number of technical issues.

As a result, the vehicle was rolled back to the Vehicle Assembly Building so the issues could be addressed.

Once the SLS rocket achieves a successful wet dress rehearsal, the vehicle will be deemed ready for its first mission, Artemis I.

The uncrewed test mission will use the SLS to power the Orion toward the moon. The spacecraft will perform a flyby of our nearest neighbor before returning to Earth.

A successful flight will pave the way for Artemis II, which will take the same path but this time with astronauts aboard the Orion.

If NASA is fully satisfied with the performance of both the SLS and the Orion, Artemis III will land the first woman and first person of color on the lunar surface in what will be the first crewed lunar landings since the final Apollo mission in 1972. Artemis III is currently scheduled for no earlier than 2025.

The Artemis program is seeking to launch a new era in lunar exploration with a view to establishing the first long-term presence on the moon. NASA said that it aims to “use what we learn on and around the moon to take the next giant leap: Sending the first astronauts to Mars.”

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
NASA’s axed moon rover could be resurrected by Intuitive Machines
An illustration of NASA's Volatiles Investigating Polar Exploration Rover (VIPER) on the lunar surface.

Lunar scientists were shocked and dismayed last month when NASA announced that it was canceling work on its moon rover, VIPER. The Volatiles Investigating Polar Exploration Rover was intended to search the moon's south pole for evidence of water there, but NASA said that it had to ax the project due to increasing costs.

This week, an open letter to Congress called the cancellation of the mission "unprecedented and indefensible," and questioned NASA's assertion that the cancellation of the mission would not affect plans to send humans to the moon. Scientists argued that the mission was fundamental to understanding the presence of water on the moon, which is a key resource for human exploration, as well as an issue of scientific interest.

Read more
NASA’s Space Launch System rocket arrives at Kennedy. Next stop: the moon
After completing its journey from NASA’s Michoud Assembly Facility aboard the Pegasus barge, teams with Exploration Ground Systems transport the agency’s powerful SLS (Space Launch System) core stage to NASA’s Kennedy Space Center’s Vehicle Assembly Building on July 23.

After completing its journey from NASA’s Michoud Assembly Facility aboard the Pegasus barge, teams with Exploration Ground Systems transport the agency’s powerful SLS (Space Launch System) core stage to NASA’s Kennedy Space Center’s Vehicle Assembly Building on July 23. NASA/Isaac Watson

NASA's epic Space Launch System rocket, standing 322 feet tall when fully stacked, has recently been on an similarly epic journey -- traveling from New Orleans to Florida via barge. The rocket began its journey more than two weeks ago, and having covered more than 900 miles has now arrived safe at the Kennedy Space Center.

Read more
NASA’s mega moon rocket has just begun a 900-mile journey
The core stage of NASA's SLS rocket.

NASA’s powerful Space Launch System (SLS) rocket is set to blast four astronauts to space next year on the epic Artemis II mission that will come within about 80 miles of the lunar surface.

In preparation for the mission, the rocket’s 213-foot-tall (65 meters) core stage has just embarked on a rather more leisurely journey -- on a barge heading for the Kennedy Space Center in Florida.

Read more